Hillhead 1999

Discuss equipment which does not fit in in the other forums here, like cable cranes, material handlers, drilling, piling and screen equipment

nicky-c
Posts: 9
Joined: Sat Oct 16, 2010 1:38 pm
Real name: nicky
Location: sheffield / wakefield

Re: Hillhead 1999

Post #11 by nicky-c » Sat Oct 16, 2010 7:53 pm

thats when it was a proper show and not hidden behind all the HSE red tape crap


jimmymc
Posts: 17
Joined: Fri Sep 24, 2010 2:56 pm
Real name: jamie mack
Flag: Great Britain

Re: Hillhead 1999

Post #12 by jimmymc » Fri Jul 29, 2011 4:26 pm

I drove the demag h255s some 18 months or so after the show during my time with law mining. drove it for about a year before getting put on the first rh120e law mining had aswell. seem to remember the 255 had abt 9000 hours on it when i first drove it. my brother actually got it after me! :D


SRB
Posts: 1247
Joined: Tue Oct 02, 2007 4:21 pm
Real name: Stu Bickley
Location: Hednesford
Has thanked: 70 times
Been thanked: 116 times
Flag: Great Britain

Re: Hillhead 1999

Post #13 by SRB » Sun Jul 31, 2011 9:34 pm

I drove the demag h255s some 18 months or so after the show during my time with law mining. drove it for about a year before getting put on the first rh120e law mining had aswell. seem to remember the 255 had abt 9000 hours on it when i first drove it. my brother actually got it after me!


Still going strong Jimmy, 41000 hours and counting on it....... The 120E's are still going, i think this one in the pic must have been your mount........

SB
You do not have the required permissions to view the files attached to this post.
He who hingeth aboot, getteth hee-haw


jimmymc
Posts: 17
Joined: Fri Sep 24, 2010 2:56 pm
Real name: jamie mack
Flag: Great Britain

Re: Hillhead 1999

Post #14 by jimmymc » Tue May 01, 2012 3:13 pm

Yes thats it! im sure the s/n was 1200001??? it was the prototype 120E. When i left it all those years ago it had a compressor strapped to the back of it to power a fireball greaser, because law wouldnt sort the hydraulic greaser that should have been on it. it also had a loft ladder in place of the main stairway you see in the pic! excellent machine ruined it was!


nick lamb
Posts: 1440
Joined: Mon Apr 25, 2011 7:51 pm
Real name: nicky lamb
Has thanked: 7 times
Been thanked: 43 times

Re: Hillhead 1999

Post #15 by nick lamb » Tue May 08, 2012 6:20 pm

Worked for Law Mining at Darnconner North and also opened up Piperhill for them.Was there the time a new RH120 arrived on 5 trucks from Germany and that c##t Mick Murphy had totally forgoton to build and compact a hard standing area to build it on.We worked 36 hrs straight through with tractor and boxes and motorscrapers to dig a big cellar out and then backfill it with compacted muck before the Germans would allow their lowloaders on it.
There was no bonus that wek either!! :lol:


jimmymc
Posts: 17
Joined: Fri Sep 24, 2010 2:56 pm
Real name: jamie mack
Flag: Great Britain

Re: Hillhead 1999

Post #16 by jimmymc » Mon Dec 17, 2012 4:42 am

mick murphy was also my boss the whole time i was with law! I get the impression you were not charmed by him!!! lol


Dr Komatsu
Posts: 9
Joined: Mon Apr 01, 2013 7:22 pm
Been thanked: 9 times

Re: Hillhead 1999

Post #17 by Dr Komatsu » Thu Apr 04, 2013 9:29 pm

Pic of the 255 loading Komatsu HD785-5's with Moxy MT40B and a Pc210LC-6 in the background taken while working onsite.
You do not have the required permissions to view the files attached to this post.


Hutch
Posts: 78
Joined: Wed Apr 27, 2011 9:51 pm
Real name: Paul Hutchison
Been thanked: 10 times

Re: Hillhead 1999

Post #18 by Hutch » Thu Apr 18, 2013 9:49 pm

Hi Stu
Still do a lot of work with the crew that had that Cat paver in the milenium dome.They thought it was a good machine and Cat threw all the extras in that was possible like fume extraction and all hydraulic adjusters on the screed but it was too large for the UK being 3.2 metres basic width which is standard in the US but requires special movement orders in the UK.The Tarmac Vogele super 1800 was one of five bought with high compaction sceeds one of them being an incline paver with extra equipment and baffles in the fuel and hydraulic tanks. It was to be used on landfill slopes to seal the tip using asphalt but Tarmac never won the contract it was bought for.The high compaction screeds were bought to lay porous asphalt as it was to be the next big thing in motorway surfaces the same as in the Netherlands .


Return to “Misc earthmoving equipment”

Who is online

Users browsing this forum: No registered users and 38 guests