Page 1 of 1

New Railway Bridge

Posted: Sun Jan 01, 2012 2:13 pm
by Neversweat
A new bridge was installed over Christmas - one of Readings worst bottlenecks -Single carriageway & 10ft bridge.

http://www.bbc.co.uk/news/uk-england-hampshire-16367565

Steve :thumbup:

Re: New Railway Bridge

Posted: Sun Jan 01, 2012 4:22 pm
by modelman093
Neversweat wrote:A new bridge was installed over Christmas - one of Readings worst bottlenecks -Single carriageway & 10ft bridge.

http://www.bbc.co.uk/news/uk-england-hampshire-16367565

Steve :thumbup:


That is amazing - all made possible by modular self propelled carriers and hydraulics.
Do any of the 'puter savvy forum members know if it can be slowed down for a better look?
Angus

Re: New Railway Bridge

Posted: Sat Jan 07, 2012 2:27 pm
by Neversweat
This is the film from the bridge replacedment 2010

http://www.youtube.com/watch?v=7HQestZREaM

Steve :thumbup: